Featured
FeaturedOil & Gas
PT PGN Solution, Kepodang Project
Scope of Work:
EPC of Kalija I (Kepodang – Tambak Lorok) gas transmission pipeline of 116 MMscfd
Future project plan is to build transmission pipeline from gas source in Bontang East Kalimantan to Kepodang with 1200 KM length namely the Kalija II.